Pearl Plaid Christmas Tree Patched Drop Shoulder Sweatshirt
This Krush Kandy private-label piece is made to order. Please note this item will ship in 4-7 Business days once it is done being made.
Pearl Plaid Christmas Tree Patched Drop Shoulder Sweatshirt
Cozy up in holiday charm with our White Pearl Plaid Christmas Tree Patched Sweatshirt. This drop shoulder silhouette brings festive flair with a plaid tree patch and pearl embellishments that sparkle against crisp white fabric. It’s the perfect blend of rustic warmth and glam—ideal for gift shopping, holiday hangs, or fireside lounging.
Why You’ll Love It
-
Plaid Christmas tree patch adds festive vibe.
-
Drop shoulder design gives a laid-back touch.
-
Quality fabric and loose fit style provide cozy warmth for holiday gatherings.
- Pearl decor adds a luxurious, tactile charm.
Product Details
- Material: 65%Polyester+35%Cotton
SIZE CHART
|
Size |
US Size |
Bust |
Hem Width |
Shoulder |
Sleeve Length |
Length |
|
Relax |
Relax |
Relax |
Relax |
Relax |
||
|
S |
4-6 |
110.0 |
96.0 |
55.0 |
53.5 |
68.0 |
|
M |
8-10 |
116.0 |
102.0 |
58.0 |
54.0 |
70.0 |
|
L |
12-14 |
122.0 |
108.0 |
61.0 |
54.5 |
72.0 |
|
XL |
16-18 |
130.0 |
116.0 |
65.0 |
54.5 |
74.0 |
- Model: Kristyn Kilcullen
- Bust: 32
- Waist: 24"
- Height: 5'2"
- Shoe Size: 7.5
-
Kristyn is 5'2" with a longer leg inseam. She wears a 26-27" for cropped jeans, a 28-29" to wear to the ankle and 29-31.5" for full length without the need to wear heels. 31.5"33" she can wear with a heel.
Free Standard Shipping on all orders over $50
Returns for Eligible Items for Store Credit Only
We offer three product types:
1. In-Stock:
Ships in 1–3 business days.
(If no preorder or made-to-order note is listed in the product description or under the add to cart button, your item is in stock.)
2. Made-to-Order:
Shows “Made to Order – 4–7 business days” under the Add to Cart button.
These items are created just for you and follow this timeline unless a preorder date is listed.
3. Preorders:
If the description includes a specific ship date or ETA, that timeline replaces the standard 4–7 business days.



